KAZ MINERALS GROUP Production Report for twelve months and THE fourth QUARTER Ended 31 december 2018
- Full year copper production1 increased by 14% to 294.7 kt (FY 2017: 258.5 kt)
- Copper production1 at upper end of 270-300 kt guidance, mainly due to strong performance from Aktogay
- Q4 copper production1 of 77.9 kt (Q3 2018: 77.2 kt), driven by Bozshakol and Aktogay
- Full year gold production2 of 183.4 koz, above guidance range of 160-175 koz (2017: 178.7 koz)
- Bozshakol
- Copper production2 increased by 6% to 26.6 kt in Q4 (Q3 2018: 25.2 kt) due to higher grades and recoveries
- Full year copper output of 101.6 kt (2017: 101.3 kt), in upper half of guidance range of 95-105 kt
- Q4 gold production2 of 34.1 koz, 9% above previous quarter due to improved recoveries and favourable grades
- Full year gold output of 127.8 koz, ahead of 115-125 koz guidance
- Aktogay
- Q4 copper production1 increased by 3% to 36.0 kt (Q3 2018: 34.9 kt) supported by strong average sulphide grade of 0.63%
- Full year copper production1 of 131.4 kt (2017: 90.2 kt), exceeded guidance of 110-130 kt
- Oxide production of 6.8 kt in Q4 and 25.7 kt for the full year, above 20-25 kt guidance
- East Region and Bozymchak
- Q4 copper production2 11% lower at 15.3 kt (Q3 2018: 17.1 kt) after stockpiled ore was processed in Q3
- Full year copper production2 of 61.7 kt (2017: 67.0 kt) against full year guidance of approximately 65 kt
- Strong full year gold (55.0 koz) and silver (2,356 koz) production2, 10% and 18% ahead of guidance, respectively
- Low grades continue to impact zinc production as indicated in Q3 production report, with full year output of 49.7 kt, below original guidance of c.60 kt
|
Group production summary3 |
|
12m 2018 |
12m |
|
Q4 2018 |
Q3 2018 |
Q4 2017 |
|---|---|---|---|---|---|---|---|
|
Copper production1 |
kt |
294.7 |
258.5 |
|
77.9 |
77.2 |
65.2 |
|
Bozshakol |
kt |
101.6 |
101.3 |
|
26.6 |
25.2 |
22.5 |
|
Aktogay |
kt |
131.4 |
90.2 |
|
36.0 |
34.9 |
26.0 |
|
East Region & Bozymchak |
kt |
61.7 |
67.0 |
|
15.3 |
17.1 |
16.7 |
|
Zinc in concentrate |
kt |
49.7 |
57.6 |
|
11.4 |
13.4 |
11.8 |
|
Gold production2 |
koz |
183.4 |
178.7 |
|
48.4 |
45.2 |
40.9 |
|
Silver production2 |
koz |
3,511 |
3,506 |
|
933 |
941 |
798 |
- Payable metal in concentrate and copper cathode from Aktogay oxide ore.
- Payable metal in concentrate.
- See appendix for metal production by asset.
Andrew Southam, Chief Executive Officer, said: “KAZ Minerals’ operating assets have delivered another strong year in 2018, with a 14% increase in copper production to 295 kt. Approximately 45% of the Group’s copper production came from the Aktogay mine, commissioned in 2017, which ramped up to produce 131.4 kt of copper, an increase of 46% compared to the prior year. I am particularly proud that 2018 marks the tenth consecutive year in which the Group has achieved its annual copper production guidance, a period which includes the successful ramp up of our two major growth projects in Kazakhstan, Bozshakol and Aktogay.”
For further information please contact:
|
KAZ Minerals PLC |
|
|
|---|---|---|
|
Chris Bucknall |
Investor Relations, London |
Tel: +44 20 7901 7882 |
|
Anna Mallere |
Investor Relations, London |
Tel: +44 20 7901 7814 |
|
Maksut Zhapabayev |
Corporate Communications, Almaty |
Tel: +7 727 244 03 53 |
|
Brunswick Group |
|
|
|
Carole Cable, Charlie Pretzlik |
|
Tel: +44 20 7404 5959 |
REGISTERED OFFICE
6th Floor, Cardinal Place, 100 Victoria Street, London SW1E 5JL, United Kingdom.
Please follow the link to download the full announcement