KAZ MINERALS GROUP PRODUCTION AND SALES REPORT FOR nine months and THE third QUARTER ENDED 30 september 2022
| 9m 2022 |
9m 2021 |
Q3 2022 | Q2 2022 | Q3 2021 | |||
| Copper production1 | kt | 281.9 | 223.9 | 102.0 | 90.0 | 73.6 | |
| Aktogay | kt | 167.8 | 102.3 | 63.6 | 53.5 | 32.4 | |
| Bozshakol | kt | 77.9 | 81.6 | 26.3 | 24.9 | 27.7 | |
| East Region & Bozymchak | kt | 36.2 | 40.0 | 12.1 | 11.6 | 13.5 | |
| Gold production2 | koz | 128.9 | 126.2 | 44.4 | 41.8 | 43.3 | |
| Silver production2 | koz | 2,718 | 2,513 | 986 | 844 | 849 | |
| Zinc in concentrate | kt | 29.4 | 34.1 | 10.2 | 8.5 | 12.3 | |
| Copper sales3 | kt | 280.4 | 199.4 | 92.9 | 96.7 | 62.4 | |
| Gold sales4 | koz | 142.3 | 98.5 | 42.8 | 49.1 | 36.0 | |
| Silver sales4 | koz | 2,995 | 2,216 | 1,003 | 990 | 805 | |
| Zinc in concentrate sales | kt | 32.7 | 33.2 | 8.6 | 9.1 | 11.1 |
1. Payable metal in concentrate and copper cathode from Aktogay oxide ore
2. Payable metal in concentrate
3. Payable metal in concentrate, toll processed metal and copper cathode from Aktogay oxide ore
4. Payable metal in concentrate and toll processed metal
Highlights
- Copper production1 increased by 26% to 282 kt in the first nine months of 2022 (9m 2021: 224 kt). The world class ramp up of the second sulphide concentrator at Aktogay, as well as improved performance at Sulphide 1 and the oxide plant, enabled Aktogay to increase its copper output by 64% to 168 kt in the year to 30 September 2022 (9m 2021: 102 kt).
- Management is focused on maximising ore processed volumes and all operations delivered increased throughput and copper output in the quarter. Both concentrators at Bozshakol operated above design capacity throughout the third quarter and due to operational improvements are on track to exceed design capacity for the full year.
- Gold production of 129 koz represented an increase of 2% compared with the first nine months of 2021 (9m 2021: 126 koz), as Bozshakol output rose due to higher ore throughput and gold grades processed.
- Copper sales were aligned with copper production in the first nine months of the year but were 9% behind production in the third quarter, as Aktogay output exceeded expectations. The Group’s finished goods inventory is expected to reduce in the fourth quarter and fully unwind during 2023.
Andrew Southam, Chief Executive Officer, said: “KAZ Minerals has delivered an excellent set of operational results in the first nine months of 2022, with copper output increasing by 26%. The world class ramp up of the second sulphide concentrator at Aktogay has resulted in a step change in our production, while site management has continued to improve ore throughput across the Group to maximise copper output.”
For further information please contact:
| KAZ Minerals | ||
| Susanna Freeman
Maksut Zhapabayev |
Company Secretary, London
Corporate Communications, Almaty |
Tel: +44 20 7901 7826
Tel: +7 727 244 03 53 |